Contact us
Follow Us:
Development Of The History
Development & History
02
In 2002
  • Shanghai Meryer Chemical Group Co., Ltd. was formally established

05
In 2005
  • Meryer Technologies Co., LTD. was formally established


06
In 2006
  • The company has won the excellent supplier qualifications of "Sinopec", "CNPC" and "CNOOC"

  • The first set of "Reforming pilot plant" for Sinopec Petrochemical Research Institute was successfully started-up

07
In 2007
  • The first set of polyolefin pilot plant developed by Meryer was successfully delivered

  • The S-Zorb adsorption desulfurization pilot plant was successfully delivered, contributing to the 2008 Beijing Olympic Games

08
In 2008
  • Meryer Technologies Co., LTD. Beijing branch was established

  • Pass the ISO9001 quality management system certification


09
In 2009
  • Shanghai Meryer Chemical Technology Co., Ltd. was formally established

  • The first set of circulating fluidized bed pilot plant start-up finished successfully

10
In 2010
  • The group company celebrated its moving to the Meryer Park located in national Minhang Development Zone and the 5th anniversary of Meryer Technologies Co., LTD.

  • Awarded the 《High tech Enterprise》Certificate

  • The first set of coal direct liquefaction pilot plant was started-up successfully

  • The first set of isoprene rubber pilot plant was started-up successfully

11
In 2011
  • The first set of ABS pilot plant was successfully started-up

14
In 2014
  • The company obtained the 《Work Safety Standardization》certificate

  • The company's first set of hydrogenation pilot plant started-up successfully

15
In 2015
  • Won the honorary title of 《Shanghai Patent Pilot Enterprise》

  • The company's first set of skid-mounted containerizing pilot plant was successfully accepted

16
In 2016
  • Won the honorary title of "Minhang District Science and technology small giant cultivation enterprise"

  • Awarded the "Shanghai Harmonious Labor Relations Standard Enterprise"

17
In 2017
  • The company's first set of F-T side line pilot plant was put into production smoothly

  • Pass the AAA evaluation,obtained《Enterprise Credit Rating Certificate》

18
In 2018
  • The successful delivery of the UOP project in the United States signifies that the products of Meryer have entered the ranks of the world's top tier

  • The project of "100-ton POR continuous polymerization pilot plant" was successfully delivered

19
In 2019
  • The company was awarded as " Shanghai Specialized, refined, and innovative small and medium-sized enterprises "

  • The Joint Graduate Training Practice Base of Lanzhou University was inaugurated

  • The project of "50 Kg / h slurry phase polyethylene pilot plant" was successfully started-up



20
In 2020
  • The project of "Polymerization tank reactor system pilot plant" was completed successfully

  • The first set of Shabit pilot plant was successfully delivered

  • Yangzi Petrochemical "skid-mounted carbon monoxide side line test device" was successfully delivered

21
In 2021
  • Shanghai Meryer Chemical Group Co., Ltd. Dalian Branch was established

  • Zhejiang Petrochemical "500 tons / year ABS pilot plant" project was completed successfully

  • Shanxi Coal "IR Project continuous polymerization Unit" project was successfully delivered

22
In 2022
  • Shanghai Meryer New Material Technology Co., Ltd. was established

  • Shanghai Minhang Center for Enterprise Technology Center was establish



23
In 2023
  • ZHONG SHI TONG(Shanghai) Technology Co., Ltd. was established

  • Dalian Changxing Island pilot plant base was launched

24
In 2024
  • ZSTO platform has been officially launched.

25
In 2025
  • Awarded the title of “General Contracting Qualification for Petrochemical Engineering Construction”

  • Awarded the title of“Professional Contracting Qualification for Building Electromechanical Installation Engineering”

  • Awarded the title of“Shanghai Technology Little Giant Enterprise Qualification”

Move the mouse here
Use the scroll wheel to switch